Data & Facts
People
Goals
Tasks
The WEB
Participation

Advantages
Environment
Technology
Economics
Politics and Laws
Austria

Webcam
News and Press
Power Production

Panoramas
Photo Galleries
Downloads

Preview
Architecture

Site
Technology
Construction
Operation
Finances
Environment

First Steps
Altener
Measurements
5th FWP EU
Reports
Project Partners

Contact - Sitemap
Tauernwind Tauernwind Windpark Tauernwind Windpark
TauernwindWindparkTourismusTauernwindTauernwindWindenergieTauernwind

Site

Technology

Wind Turbines
Nacelle
Site Plan
Accessibility
Power Cables
Grid Connection


Construction

Operation

Finances

Environment

Power Cables

 

 

Switching station Tauernwindpark near WT 3 with a 30 kV switch gear system.

Total length: 20.86 km

Rated voltage / Operating voltage: 33.3 kV

Double system: 2 transmission systems with 3 conductor wires each with 240 mm² cross-section (2x3x240)

13 crossings of streams incl. the Mur River

6 crossings and routes along regional and national streets

1 crossing and route along the Murtal Railroad

Contracts with over 60 property owners.

Transformer Station Teufenbach:
30 kV switch gear system
10 kV compensation system
22MVA transformer (31.5/33.3 kV)

   
 

During construction of the new underground power cables, the STEWEAG used the special opportunity to put in their own 30 kV cable for a length of 9.5 km. This will make it possible to take down some of the overhead power lines along the route.